...Cold, wet and windy, that's what it's been like today, But we knew it was coming, so we waited until the rain stopped, or at least slowed, and we made a run for it. Once we got under way it emptied down and I struggled all the way from Bridge 28 to Bridge 16 in torrential rain. I just had to stop, I was soaked. But when we did stop so did the rain. Then later it drizzled heavily 'til 15:30 when we decided to make another run for it. A bit better this time, we arrived at Bridge 3 by around 17:30 just right for joining the main line tomorrow.
Whilst waiting for the rain to stop I fitted a
cover for the control panel. I had to drill and countersink six holes for the attachment screws. No pictures yet, you'll have to wait for the unveiling ceremony, but first I need to buy some M5 x 25mm slotted countersink brass screws and attach it properly.
Sorry, only one picture today, the weather has been far too...
|
TQ on the Ashby, Bridge 3 in the background.
The sun finally shone. |
No comments:
Post a Comment