We're fed up with the wet and windy. But there are a few jobs to be done first. I have to drain the water system as its Maintenance Fortnight and being January the risk of frost is high. While the water is drained the immersion heater needs to be removed as its leaking. I'll replace it with a brass plug, as we don't use it, it's not even connected electrically.
No comments:
Post a Comment