TRANQUILITY IS A SELF MANAGED SHARE BOAT
Our friendly Syndicate decided to go down the Self Management route on 1st March 2012 and so far it has been very successful. Please visit the other pages in this blog to see the new Web Site and if shares are available for sale. (There'll not be many).
All content is Copyright N. B. Tranquility © 2008 - 2019
Monday, 29 November 2010
From bad to worse (KLT)
Here is a list of "happenings":-
Canal closed at Trevor in addition to Llangollen (not made clear by BW)
Flat engine starter battery
Alternator failure
Domestic alternator failure (Low output)
Even more "sluggish" bow thruster
Webasto failure (Valve left closed)
Webasto failure again (Flooding (fuel))
Being told that TQ wouldn't pass the BSS
Having to leave the engine running all night (2 nights)
Frost all over the inside of the windows (2 mornings)
Canal frozen solid
Kevin and Linda well teed off (and we don't play golf)
Sunday, 28 November 2010
It's so cold... (KLT)
We've been a bit tired all day due to us not sleeping very well. We have to leave the engine running all night because if we stop it we won't be able to start it again. We're not moored near a boatyard so there is no one nearby to help if things get dodgy. We tried to get water at the top of Grindley Brook Locks but our hose is blocked with ice and the water pressure at the tap was not enough to push it through. We're not desperate for water yet, but it would have been peace of mind to have filled up.
Due to our battery problem we're not able to leave TQ unattended with the engine running which means we can't stop for lunch at the Willey Moor Tavern so we have to keep going until the cold beats us. We're moored on PVM (public visitor moorings) at the top of Baddiley Locks about 4 or 5 hours from our mooring at Aqueducd Marina, but I fear there's going to be some thick ice on the cut tomorrow morning from Hurleston onwards which might delay us.
Friday, 26 November 2010
A very frustrating day (KLT)
Our holiday is now becoming just a little bit of a chore now, and we're beginning to want to go home...after having arranged to extend it by two days!
On a brighter note we saw three kingfishers today, and we had some snow...just a light sprinkling, but I dare say there may be more in the morning. I hope the cut doesn't freeze up too much, though I fear the Shroppie Main Line and the Middlewich Branch are more likely to freeze as they don't flow like the Llangollen does.
Sorry there's no pix today, after this mornings caper I forgot and didn't feel like getting the camera out.
More tomorrow.
Thursday, 25 November 2010
Ice on the cut...and some snow (KLT)
And this crept up behind me:-
Wednesday, 24 November 2010
Things didn't quite go to plan. (KLT)
Next, on to the Webasto heater. Oh! dear, how sad, never mind. The rubber water supply and return hoses connected between the heater and the water circuit had collapsed stopping the flow to/from the heater so the pump had stalled and the water in the boiler had over heated hence the auto switching off last night. Tony removed one of the supply hoses and there was no water in it. I checked the water level in the expansion tank and that was 3/4 full, it was then I noticed the valve under the tank was off! Of course, that's it! With the valve off the water cannot expand with the heat so the rubber hoses expand and probably there's some loss of water, possibly through a pressure relief vent. When it all cools the water contracts and hence the hoses collapse. So the solution was simple, connect it all up again, turn on the valve and try again. Success! after a smokey start it was away. Tony fitted some curly wrap around the hoses to help re shape them and re terminated one of the hoses removing the flattened part. And it was all serviced last week, I reckon someone forgot to turn on the valve again. A big thank you to Tony from Anglo Welsh for getting us out of a sticky spot.
Back to TQ and I stoked the stove and tested the heating, all OK, and then I went for a walk across the Pontcysyllte Aqueduct to the lifting bridge in Froncysyllte and back on the other side of the cut to the aqueduct, then under it and back up to the towpath again. A lovely late afternoon stroll.
The weather forecast doesn't look good, there's a high possibility of snow over the next few days, we'll have to keep a watchfull eye on it.
More tomorrow - hopefully.
Tuesday, 23 November 2010
Tuesdays blog...Llangollen, well not quite (KLT)
Made an even earlier start today and lifted the hooks shortly after 07:00 hours and proceded up to the first of the two New Marton Locks. I was hoping to do this one on my own but Lin emerged from her pit in time to steer TQ into the lock. The scenery is becoming more interesting the further we go and is quite dramatic as we approach Chirk.
Mondays blog... (KLT)
I thought it strange that the bridges are numbered 1 from Hurleston to 69 at Frankton Junction, and 1W from Frankton Junction to 49W at Horseshoe Falls. I guess the W means West.
Tonight we're moored between the Jack Mytton and New Marton locks having set the mooring hooks in at around 16:30.
Sunday, 21 November 2010
Nine hours to Whitchurch (KLT)
Saturday, 20 November 2010
What a day! (KLT)
The AGM went well, it had an easy atmosphere about it, and some radicle decisions were made about the inside and the outside of TQ. After the February maintenance slot TQ should look very different. Watch this space! A lot of work has already been done, the Webasto heater has been serviced, Bubble stove has been blacked and chimney swept, galley floor has been sanded and two coats of varnish applied, a new stern button fitted, shower resealed, and woodwork inside the windows resealed, engine room degreased and cleaned, anti-freeze checked and topped up, etc. etc. etc.
After the AGM Artie brought us back to Elton Moss and we made our way across country through the lanes to Church Minshull and on to Aqueduct Marina. Poped into the reception (very posh) and enquired about the keys for TQ. Guess what, they couldn't find them, further they didn't know where TQ was. An engineer was called and he knew where TQ was and he showed me where and we looked in the gas locker and lo and behold there were the keys. We unloaded the car and awaited a visit from a prospective share purchaser and he turned up early - ideal. He just wanted to have a look around TQ with a view to buying a share.
All that done, we chugged our way out of the Marina and headed to Barbridge where we're moored for the night. Had a good meal in the Olde Barbridge Inn, nice, although its looking a bit careworn in places.
Sorry there's no photos today, haven't unpacked the camera yet. Not only that the 3 connection is a bit, no, very slow here so I doubt photos would upload anyway.
More tomorrow - hopefully!
Sunday, 7 November 2010
In preparation (KLT)
I've a feeling we won't get to Llangollen due to the shorter daylight hours at this time of the year, but you never know. Lets just hope the weather holds out.
Saturday, 11 September 2010
Oozells Loop to Alvechurch (KLT)
Friday, 10 September 2010
Merry Hill to Oozells Loop (KLT)
So under Tividale Aqueduct and a short stop for lunch, then a right turn at Dudley Port Junction, and just keep on chugging 'til we get to Oozells Loop. This bit always seems a long way, its about seven miles, but always seems longer. I pulled a fast one and dived in the back way into Oozells Loop (Western end) to save turning around and reversing back onto our favourite spot.
Thursday, 9 September 2010
Stourton Top Lock to Merry Hell Shopping Centre (KLT)
Foot note:- The problem with mooring in places like this is that passers by like to gawp in through our windows, so the curtains are drawn well before dark.
Wednesday, 8 September 2010
Stourport-on-Severn to Stourton Top Lock, Staffs & Worcs Canal (KLT)
Tuesday, 7 September 2010
Worcester to Stourport via The Severn (KLT)
We left Diglis Basin this morning at 09:30 and I turned left to "do a donut" and moor on the river pontoon facing upstream in order to pick up Lin as there is no access to the river from the upstream side of the junction. Lin was well impressed with my manoeuvring skills.
So we start the journey to Stourport and this river is so much more interesting in this direction. Here's some pix near Worcester:-
All in all its been a good day and I have to say the Severn is much more picturesque North of Worcester.
Monday, 6 September 2010
Start as you mean to go on. (KLT)
...And by 18:45...
There being no "3" signal at the Queens Head (bottom of Tardebigge Flght) there was no blog yesterday...sorry!
Monday turned out to be a nice day although the gale force wind spoilt things a bit, at least it was'nt cold. We made our way to Worcester stopping off at the Eagle and Sun for a carvery lunch which was excellent, and at £5.99 each I thought it was a bargain.
Whilst making our passage through Offerton Locks the BW lengthsman helped us through by filling the next lock for us and opening the gate. All this while cutting the grass and lubricating the paddle gear. A helpful chap indeed.
As we approached the Commandery in Worcester it started to rain and by the time we arrived it was hammering down, and tonight we're moored on public moorings between Sidbury Lock and Diglis Locks. Tomorrow its the Severn and hopefully we'll reach Stourport and with a bit of luck we'll have time to look around the town.
Saturday, 4 September 2010
Visit to Coughton Court
After that it was time to get back to the boat and carry on with the sorting and cleaning in preparation for leaving in the morning and saying Goodbye to TQ until next year!
Friday, 3 September 2010
'Home' Early.
Thursday, 2 September 2010
'Bye 'Bye Brum!
Wednesday, 1 September 2010
Retail Therapy.
We had a quiet night at Oozells Loop, as on previous occasions, and woke to a beautiful morning. We decided to have a quiet morning on board, with an early lunch then off to the shops for some new clothes. The shopping centre was extremely busy and the open spaces were full of people enjoying their lunches and chats outside, amidst the lovely floral displays. As well as acquiring some new clothes, I also had the nice surprise of choosing a ruby ring to celebrate our Ruby Wedding Anniversary which is coming up in October! We arrived back at TQ about six p.m. and left about 7:15 for the very short walk to Pizza Express. All the restaurants were busy, with most of the tables outside being occupied. Quite a buzzing atmosphere. Back inside to the blog and a bit of reading.

